Apartment buildings, townhomes, and senior living — the product type Edge Enterprise has built its reputation on, with 1,000+ units framed.
Looking for multi-family framing in Wadena? Edge Enterprise LLC is a family-owned contractor with 25+ years in the trade and over 1,000 framed units in its portfolio. Small towns like Wadena are where we're from — Edge Enterprise is headquartered in Long Prairie (pop. 3,400), so we understand Wadena County building the way locals do.
Our Long Prairie, MN base puts Wadena about 45 minutes out. We plan mobilization, material staging, and crew rotations around that from day one. Projects here fall under the Minnesota State Building Code, with local city or county building officials as the AHJ. Typical design values for the Wadena area — ground snow load around 50–60 psf, design wind speeds of 105–115 mph, and frost depths near 60 in. — are baked into how we detail and build here; final values are always confirmed with the local building official.
45th Street Apartments, ENVY, EOLA, Oxbow Heights, and more. Multi-family isn't a sideline for us — it's the core of our portfolio.
Multi-family rewards crews who can hold quality across hundreds of identical walls. Our unit-by-unit QC keeps floor 4 as tight as floor 1.
Party walls, floor-ceiling assemblies, draft stopping, and shaft walls built exactly to the listed assembly — because that's what the inspector will check.
Yes — multi-family is Edge Enterprise's core specialty. We've framed over 1,000 units across the Upper Midwest, including 45th Street Apartments, ENVY, EOLA, and Oxbow Heights, working with repeat GC partners like Comeland Builders, Gast Construction, and Miller Architects & Builders.
Garden-style apartments, wrap and podium buildings, townhomes, and senior living communities. If it's wood-frame or hybrid wood-over-podium construction in Wadena, it's squarely in our wheelhouse.
Crew sizing, panel/component strategy, and honest look-ahead scheduling. We build a unit-by-unit production plan with the GC and report against it weekly — no surprises at the OAC meeting.
Yes. Rated party walls, floor-ceiling assemblies, draft stopping, and shaft construction are standard scope on every multi-family frame, built to the listed assembly and walked with the inspector.
Tell us about your build. We'll get back to you with a clear, honest scope and estimate — typically within one business day.
Request a Free Estimate